You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Embung di Tegal Alur Mencegah Luapan Kali Semongol
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Retention Basin Construction in Tegal Alur is Expected to Overcome Inundation

Jakarta Water Resources (SDA) Agency currently builds Tegal Alur Retention Basin in Kalideres, West Jakarta. This retention basin will be used to overcome inundation that often occurs at Tegal Alur Lokbin Public Housing (Rusun) due to rain and tidal flood.

We start this project in September and target it to finish by the end of December

Jakarta SDA Agency Head, Juaini Yusuf stated, his side will build retention basin with size 2,410 square meters.

"When the rain falls, Tegal Alur Lokbin Public Housing often inundated because of overflowing Semongol River. This area is also inundated when tidal flood occurs," he explained, Monday (10/26).

Joint Personnel Deployed to Clean Situ Munjul Reservoir Area

According to him, this retention basin will have depth about 3 meters with capacity 7,230 cubic meters of water.

His side expected that when Semongol River overflows, water can flow into the retention basin first.

"We start this project in September and target it to finish by the end of December," he asserted.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye659 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye597 personFolmer
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye437 personAldi Geri Lumban Tobing
  4. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye306 personAldi Geri Lumban Tobing
  5. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye262 personBudhi Firmansyah Surapati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik